
Better service as tunnel re-opens
- Select a language for the TTS:
- UK English Female
- UK English Male
- US English Female
- US English Male
- Australian Female
- Australian Male
- Language selected: (auto detect) - EN
Play all audios:
Loading...
Eurotunnel has announced it has reopened a 17-km section of the Channel Tunnel damaged by a fire.
Train operators have been running a limited service through the southern tunnel which was undamaged by the fire which broke out on September 11.
A statement from Eurotunnel said: “Bringing a 17-kilometer-long section of the north tunnel back into service will enable Eurotunnel to increase the number of trains running through the
tunnel to almost 170 per day.”
A Eurotunnel spokesman said the improvement would bring overall traffic to 80 % of the level before the fire, while shuttle services would run at 50 % of capacity.